Back to all case studies

Defense Support Camp in Mogadishu

Mogadishu, Somalia

Scope

Engineering, procurement, delivery and installation of accommodation facilities, offices, a secure bunker, and recreational facilities for a site at Mogadishu airport in Somalia.

Client

Saab AB

location

Mogadishu, Somalia

Key Challenges:

  • Short timescale for the first phase of the project

Our Approach:

  • Arranged the design and manufacture of first-phase buildings at a source in Dubai
  • Shipped first-phase buildings by air direct to Mogadishu
  • Manufactured second-phase buildings at partnered facilities
  •  Consolidated shipments of buildings from China, along with all fixtures and fittings, which included furniture, air conditioners, catering equipment, solar heaters, TVs and gym equipment.

OutCome:

  • Within the agreed time schedule
  • Provided quality products
  • Within the agreed budget (including shipping)